Main Service Panel Replacement

Electrical Panel Upgrades, Subpanel Installations & Main Panel Replacements in Vallejo and Surrounding Areas

Your home’s electrical panel is the heart of your electrical system—responsible for safely distributing power to lights, outlets, appliances, and every other part of your home. At Site Electric Services, we specialize in safe, code-compliant electrical panel upgrades, subpanel installations, and full main panel replacements throughout Vallejo, Benicia, Napa, Fairfield, Concord, and surrounding North Bay communities.

Whether you’re experiencing frequent breaker trips, planning a remodel, or simply need to bring your system up to current code, our licensed electricians are here to guide you through the process—from permitting to final inspection.

Why Upgrade Your Electrical Panel?

Many older homes in the Bay Area still rely on outdated 60 or 100 amp service panels, some of which may be overloaded or even unsafe. An electrical panel upgrade increases your system’s capacity, improves safety, and allows you to support new technology like:

  • Electric vehicle (EV) chargers
  • Solar PV systems and battery storage
  • Central HVAC systems
  • Kitchen or laundry renovations
  • Accessory dwelling units (ADUs)

If your existing panel is more than 30 years old, you may be at risk of hidden fire hazards, especially if your home still has a Federal Pacific Electric (FPE), Zinsco, or Pushmatic panel—many of which are now known to fail under overload conditions.

Signs You May Need a Panel Upgrade

Not sure if your panel is up to the task? Here are some common red flags:

  • Frequent breaker trips or flickering lights
  • Lack of available breaker space for new circuits
  • Overheating or buzzing noises from the panel
  • Burn marks or corrosion on breakers
  • You’re planning a renovation or new appliance install
  • Home still has a fuse box or outdated service entrance

If any of these apply to your situation, it may be time to consider upgrading.

Our Panel Replacement Process

At Site Electric Services, we take pride in making the panel replacement process smooth, transparent, and hassle-free. We handle everything—so you don’t have to worry about permits, code violations, or dealing with the power company.

Step 1: Onsite Assessment & Quote

We start with a site visit to inspect your existing panel, service entrance, and grounding system. We'll review your power usage, any planned upgrades, and identify your utility provider’s requirements. From there, we’ll provide a detailed, no-obligation quote outlining your options.

Step 2: Permit & Utility Coordination

We obtain all required permits from your local building department and submit any necessary service upgrade applications to your utility provider, whether it's PG&E, City of Napa Utilities, or another provider. Our team handles the drawings, photos, and load calculations required for approval.

Step 3: Scheduling the Shutdown

For main panel replacements, the utility will need to shut off power to your home. We coordinate this with their scheduling department and typically perform the changeover in a single day, minimizing downtime. For subpanels, no utility shutdown is needed.

Step 4: Panel Upgrade Installation

On the day of your install, our licensed electricians:

  • Safely disconnect and remove your old panel
  • Upgrade service conduit and grounding if needed
  • Mount and wire the new panel or subpanel
  • Re-label circuits clearly and clean up all wiring
  • Ensure compliance with NEC 2023 and local amendments
  • Call for inspection and/or meter re-energization

We use top-rated equipment from manufacturers like Square D, Eaton, and Siemens—ensuring you get reliable, high-quality components that last.

Step 5: Final Inspection and Power Restoration

After installation, we schedule the required building inspection, and the utility company comes out to re-energize your meter. We stay on-site to confirm everything is up and running—and your home is safe, compliant, and fully powered.

Subpanel Installations: When and Why You Need One

A subpanel is a smaller distribution panel that connects to your main panel and feeds power to a specific area—like a garage, workshop, ADU, or addition.

Subpanels are ideal when:

  • You’ve run out of breaker space in your main panel
  • You’re powering a detached structure
  • You’re installing high-demand appliances in one area
  • You want localized control over certain circuits

We install subpanels that are fully grounded, labeled, and expandable. Whether you’re running a 60 amp panel to your backyard office or a 100 amp panel for a new in-law unit, we’ll make sure it’s installed right the first time.

Budget-Friendly, Transparent Pricing

We offer fair and competitive pricing based on the size of your system, level of access, and site complexity. Every panel installation is quoted individually after a site visit, but here are some average costs to help you budget:

Service Type

Estimated Price Range (Actual Prices Vary Depending on Conditions)

  • Subpanel Installation: $2,500+
  • Main Panel Replacement (100A):$4,500 – $6,500+
  • Main Panel Replacement (200A): $4,500 – $7,000+
  • Permit & Utility Coordination: Included in price

Note: Trenching, service relocation, or meter upgrades may increase the project scope. We provide upfront pricing with no hidden fees.

Why Choose Site Electric Services?

We know you have options when it comes to electricians in the North Bay, but here’s why hundreds of local homeowners choose Site Electric Services:

✔ Licensed, Insured, and Experienced

Our electricians are licensed, bonded, and up-to-date with all California Electric Code and Title 24 requirements. We’ve installed panels in everything from older Vallejo bungalows to new hillside homes in Napa.

✔ Focus on Clean, Safe Work

We take pride in our craftsmanship. That means neat, organized wiring, clearly labeled panels, and job sites left as clean as we found them.

✔ Transparent Pricing & No Surprises

We walk you through every step of the process, so you understand exactly what’s happening. No sales pressure. No fine print.

✔ Fast Turnaround & Reliable Scheduling

We work closely with your utility and inspector to keep your project on track. Most panel replacements are completed in 1 day, with permits and final inspection handled start to finish.

Serving Vallejo, Napa, Benicia, Fairfield & Beyond

We proudly serve homeowners across Solano and Napa Counties, including:

  • Vallejo – Historic homes, Hillside upgrades
  • Benicia – Coastal neighborhoods and remodels
  • Napa – Custom homes, ADU upgrades, vineyard properties
  • Fairfield
  • Concord
  • Martinez

No matter the city or structure, we’re committed to bringing safe, reliable power to your home.

Ready to Upgrade Your Panel? Let's Talk.

Don’t wait until you’re left in the dark. Upgrading your electrical panel not only improves your home’s safety—it prepares you for the future. Contact Site Electric Services today to get a professional assessment and a clear, honest quote.

Other Services We Offer:

Residential Electrical Service.
For the best electrical service in Solano & Napa Counties,

Call Site Electric Services Today!
CALL US (707) 653-0376